Leytron, new 4.5 room promotion in a 3 apartment PPE
Rooms4.5
Living area~ 119 m²
FloorGarden floor
Object PriceCHF 820,000.-
AvailabilityWinter 2026
Localisation
Route du Stade, 1912 LeytronCharacteristics
Reference
5403489
Availability
Winter 2026
Bathrooms
2
Year of construction
2026
Rooms
4.5
Bedrooms
3
Floor
Garden floor
Weighted Surface
~ 126 m²
Heating type
Heat pump
Heating installation
Floor
Domestic water heating system
Heat pump
Garden surface
~ 110 m²
Condition of the property
New
Standing
Standard
Living area
~ 119 m²
Terrace surface
~ 18 m²
Number of parkings
Interior
1 | CHF 20,000.- not included
Exterior
1 | CHF 10,000.- not included
Description
Text translated from french, see original.
Original text in french, translate to English.
ADM Immobilier offers the QZ development in the village of Leytron. This is a small condominium consisting of 3 apartments, with delivery scheduled for winter 2026 (building permit in force).
Lot No. 1 4.5-room apartment on the ground floor with private garden
Located in a quiet area with ideal exposure, this apartment has many advantages:
The finishes are at the tenant's discretion, according to the construction description. Work is scheduled to begin in autumn 2025 for delivery in winter 2026.
Don't wait to reserve your future home! Contact us for a detailed presentation of the project and plans, or to arrange a site visit. This intimate development has only three apartments - availability is therefore very limited.
Lot No. 1 4.5-room apartment on the ground floor with private garden
Located in a quiet area with ideal exposure, this apartment has many advantages:
- Spacious apartment with a gross living area of 119 m2
- Located at the edge of the building zone, with direct access to orchards and the banks of the Rhone
- Heating with heat pump and cooling (free-cooling)
- Master bedroom with en-suite bathroom
- Terrace of 18 m2 and private garden of 110 m2
- Covered parking space with adjoining cellar
The finishes are at the tenant's discretion, according to the construction description. Work is scheduled to begin in autumn 2025 for delivery in winter 2026.
Don't wait to reserve your future home! Contact us for a detailed presentation of the project and plans, or to arrange a site visit. This intimate development has only three apartments - availability is therefore very limited.
Conveniences
Neighbourhood
- Village
- Villa area
- Green
- Shops/Stores
- Bank
- Post office
- Restaurant(s)
- Bus stop
- Highway entrance/exit
- Child-friendly
- Playground
- Nursery
- Preschool
- Primary school
- Secondary school
Outside conveniences
- Exclusive use of garden
- Quiet
Inside conveniences
- Without elevator
- Visitor parking space(s)
- Open kitchen
- Guests lavatory
- Pantry
- Cellar
- Bright/sunny
Equipment
- Private laundry
Condition
- New
Orientation
- South
- East
- West
Exposure
- Optimal
- All day
Distances
Public transports
283 m
8'
8'
2'
Primary school
277 m
9'
9'
2'
Stores
351 m
12'
12'
2'
Post office
405 m
12'
12'
2'
Bank
356 m
9'
9'
2'
Restaurants
419 m
11'
11'
2'



