New construction of 6 apartments, certified Minergie + 4 apartments in an existing building
Rooms3.5
Living area64 m²
Floor2nd floor
Object PriceCHF 635,000.-
Availability31.12.2026
Localisation
A Orbe, 1350 OrbeCharacteristics
Reference
78317
Availability
31.12.2026
Year of construction
2026
Rooms
3.5
Floor
2nd floor
Number of levels for the real asset
2
Living area
64 m²
Useful surface
75 m²
Description
Text translated from french, see original
Original text in french, translate to English.
MINERGIE CONSTRUCTION! CONSTRUCTION
PERMIT ISSUED BY THE COMMUNE!
ALREADY SEVERAL LOTS RESERVED!
New construction of 6 apartments in EPC of 3½ to 4½ rooms (lots 1 to 6), distributed in a 4-storey building, labeled Minergie + 4 apartments of 2½ to 3½ rooms (lots 7 to 10) in an existing building.
These apartments are perfectly located a stone’s throw from the city center, in the immediate vicinity of Parc St-Claude and close to the L’Orbe River.
Magnificent new duplex EPC of 3½ rooms + gallery on the 2nd floor (lot 9) consisting of:
On the first level:
- a wall cupboard at the entrance
- 2 bedrooms (~ 10.5 and 14.0 m²) – a fully equipped open kitchen – a spacious living room with dining area and access to the
balcony
- a shower room/WC with a column shower and a tumble dryer
- a balcony (~ 10 m²) facing southeast
On the second level:
- a large gallery (~ 21.1 m² at a height of 130 cm) with a void over the living room
- a storage room
The finishes are at the discretion of the future buyers according to the prices mentioned in the general description of the construction.
This lot offers a splendid unobstructed view of the Orbe plain and the foothills of the Alps.
A cellar in the basement and a covered outdoor parking space (CHF 25,000.- in addition to the listed sale price) are the perfect complement to this property. Outdoor parking spaces (at a price of CHF 15,000.- per unit) are available. There are also outdoor parking
spaces for motorcycles (at a price of CHF 7,500.- per unit). Access is from the lower level from the Chemin Venel.
In addition, 2 spaces for bicycles will be provided outside.
The future residents of the EPC will also be able to enjoy a pleasant outdoor area with a playground, among other things. Its central location (a stone’s throw from the city center), quiet and sunny location make it a
pleasant place to live. Start of construction scheduled for mid-April 2026 Delivery date scheduled for: from the end of June 2027 Do not hesitate to contact us without delay for more information on this new development! Ask us for the sales brochure for this property.
PERMIT ISSUED BY THE COMMUNE!
ALREADY SEVERAL LOTS RESERVED!
New construction of 6 apartments in EPC of 3½ to 4½ rooms (lots 1 to 6), distributed in a 4-storey building, labeled Minergie + 4 apartments of 2½ to 3½ rooms (lots 7 to 10) in an existing building.
These apartments are perfectly located a stone’s throw from the city center, in the immediate vicinity of Parc St-Claude and close to the L’Orbe River.
Magnificent new duplex EPC of 3½ rooms + gallery on the 2nd floor (lot 9) consisting of:
On the first level:
- a wall cupboard at the entrance
- 2 bedrooms (~ 10.5 and 14.0 m²) – a fully equipped open kitchen – a spacious living room with dining area and access to the
balcony
- a shower room/WC with a column shower and a tumble dryer
- a balcony (~ 10 m²) facing southeast
On the second level:
- a large gallery (~ 21.1 m² at a height of 130 cm) with a void over the living room
- a storage room
The finishes are at the discretion of the future buyers according to the prices mentioned in the general description of the construction.
This lot offers a splendid unobstructed view of the Orbe plain and the foothills of the Alps.
A cellar in the basement and a covered outdoor parking space (CHF 25,000.- in addition to the listed sale price) are the perfect complement to this property. Outdoor parking spaces (at a price of CHF 15,000.- per unit) are available. There are also outdoor parking
spaces for motorcycles (at a price of CHF 7,500.- per unit). Access is from the lower level from the Chemin Venel.
In addition, 2 spaces for bicycles will be provided outside.
The future residents of the EPC will also be able to enjoy a pleasant outdoor area with a playground, among other things. Its central location (a stone’s throw from the city center), quiet and sunny location make it a
pleasant place to live. Start of construction scheduled for mid-April 2026 Delivery date scheduled for: from the end of June 2027 Do not hesitate to contact us without delay for more information on this new development! Ask us for the sales brochure for this property.
Conveniences
Outside conveniences
- Balcony/ies
- Parking
Inside conveniences
- Lift/elevator
Condition
- New
View
- Nice view
Standard
- Minergie®







