New: contemporary villa on plan in the surroundings of Nyon
Rooms8
Object PriceCHF 2,990,000.-
AvailabilityTo agree
Localisation
1270 TrélexCharacteristics
Reference
E8DD-MNA8-48
Availability
To agree
Year of construction
2024
Rooms
8
Number of levels for the real asset
4
Useful surface
335 m²
Description
Text translated from french, see original.
Original text in french, translate to English.
Located in a quiet and sought-after area of Trélex, in a cul-de-sac, close to all amenities, this elegant and understated villa, designed on a plan, will be perfect for a family with children. Built on 4 levels, it will have beautiful living spaces and will offer optimal brightness thanks to its large openings. This architect-designed villa will offer high-end finishes and features, with noble materials such as wood. Thanks to the Minergie label, solar panels and geo-cooling, the energy efficiency will be optimal.
Layout of the spaces:
Ground floor:
First floor:
Attic:
Basement:
Outdoor spaces and highlights:
Contact us for more details.
Layout of the spaces:
Ground floor:
- Entrance with storage
- Open-plan fully equipped kitchen
- Living and dining room opening onto the terrace
- Bedrooms
- Office
- Bathroom
First floor:
- Large distribution hall
- Master bedroom suite
- Two bedrooms
- Two bathrooms
- Library or office of more than 20 m²
- Access to a 14 m² balcony
Attic:
- 38 m² space to be fitted out, perfect as a play area
Basement:
- Technical room and pool area
- Storage spaces
- Laundry room
- Wine cellar to be fitted out
- Multipurpose room that can be used as a home cinema or fitness room
Outdoor spaces and highlights:
- Secure neighborhood at the end of a cul-de-sac
- Wooded environment offering a bucolic atmosphere
- Landscaped garden
- Villa designed by an architect
- Optional swimming pool, permit in progress
- 3 minutes from the motorway
- Near the small train that connects the Nyon train station in a few minutes
- Moser school nearby
- Shopping center nearby
- Energy efficiency: Minergie label, solar panels and geo-cooling
- Possibility of choosing material finishes, budget on request
- Work to start in September 2024 - Delivery end 2025
Contact us for more details.







