Firstview
Picture 1
Picture 2
Picture 3
Picture 4
Picture 5
Picture 6
Picture 7
Picture 8
Picture 9
Picture 10
Picture 11
Picture 12
Second home

Residential Project "La Torre di Eva" near Lugano Center - PPP4

Rooms3.5
Living area104.8 m²
Floor3rd floor
Object PriceCHF 2,174,072.-
Availability17.12.2025
Messenger PDF Dossier Financing
Add to favoritesRemove from favorites

Localisation

Via Mazzini 11, 6900 Lugano

Characteristics

Reference
PPP04
Availability
17.12.2025
Second home
Non authorized
Bathrooms
2
Rooms
3.5
Bedrooms
2
Floor
3rd floor
Balcony surface
10.8 m²
Living area
104.8 m²
Total surface
110.2 m²

Number of parkings

Total
1 | CHF 80,000.-

Description

Apartment floor 3 - 3 1/2 rooms

SUL apartment 106.1 m2
SUL covered balconies 10.8 m2
SUL rooftop terrace (rooftop) 107.8 m2
Commercial sup. app. 110.2 m2
Commercial sup. rooftop 5.9 m2
Total commercial sup. 116.1 m2

The new project "Eva's Tower Residence" envisages the construction of a building with 6 apartments of 3.5 rooms arranged on 6 levels, with a panoramic rooftop sun terrace, and 2 basement floors (the -1 housing the cellars, laundry, recreation rooms, etc. and from the -2 housing the parking garage (9 parking spaces) accessible via a car lift equipped with an acoustic/lighting signal).

Access to the building is possible from Via Mazzini, a one-way street.

A communal rooftop terrace provides an unobstructed 180-degree view of the Lugano Gulf.

The apartments offer: an open plan living room with kitchen and dining area, 2 bedrooms, bathroom with shower, bathroom with bath.

Each apartment has at least one balcony/covered loggia of different sizes, a wine cellar on the -1 floor for exclusive use; a common wine cellar (on request) with individual spaces inside dedicated to individual PPPs, a common fitness room, a common countercurrent swimming pool/sauna room, laundry room with independent washing machine/tumbler tower and common drying room with dehumidifier, technical room.

Parking spaces: 3 apartments may have 2 garage parking spaces while the other 3 may have only 1. However, parking spaces can be rented indefinitely within a few minutes' walk.

Beginning of construction: spring 2023.

Construction end: December 17, 2025, barring unforeseen circumstances.


NOTE: In case of secondary residence, an increase 7% should be applied and it should be noted that the indicated price is excluding VAT.