×
Firstview
Picture 1
Picture 2
Picture 3
Picture 4

housing + permit for 7 apartments

Object PriceCHF 1,690,000.-
AvailabilityTo agree
Messenger PDF Dossier Financing
Add to favoritesRemove from favorites

Localisation

1854 Leysin

Characteristics

Reference
I-25-L02
Availability
To agree
Ground surface
1,654 m²

Description

Text translated from french, see original.
Original text in french, translate to English.
Opportunity for investor or developer

This project is located on a plot of 1'654m2 in the center of Leysin. It includes an existing house with two apartments (all rented) with garages and the building permit for two new buildings for main residence.

Building A (3 apartments):
1 x studio (ground floor)
1 x 3,5 pc (1st)
1 x 3,5 pc (2nd)
3 x covered parking spaces
technical room and cellars

Building B (4 apartments):
1 x 3,5 pc (ground floor)
1 x 2,5 pc (1st)
1 x 3,5 pc (1st)
1 x 5,5 pc (2nd)
5 x covered parking spaces
technical room and cellars

Existing building (2 apartments):
1 x 4,5 pc (ground floor)
1 x 4,5 pc (1st)
5 x garage boxes (basement)

The price includes the plot, the existing building, the permit for the two new buildings including the fees. Not included are the various connection fees, etc.. .
Opportunité pour investisseur ou promoteur

Ce projet est situé sur une parcelle de 1'654m2 au centre de Leysin. Il inclut une maison existante de deux appartements (tous loués) avec garages et le permis de construire pour deux nouveaux bâtiments destinés à de l'habitation principale . 

Bâtiment A  (3 appartements) :  
1 x studio (rez)
1 x 3,5 pc (1er)
1 x 3,5 pc (2ème)
3 x places de parc couvertes
local technique et caves

Bâtiment B  (4 appartements) :  
1 x 3,5 pc (rez)
1 x 2,5 pc (1er)
1 x 3,5 pc (1er)
1 x 5,5 pc  (2ème)
5 x places de parc intérieures
local technique et caves

Bâtiment existant  (2 appartements) :  
1 x 4,5 pc (rez)
1 x 4,5 pc (1er)
5 x box garage (sous-sol)

Le prix inclut la parcelle, le bâtiment existant, le permis pour les deux nouveaux bâtiments y.c. les émoluments. Ne sont pas inclues les diverses taxe de raccordement, etc.. .